SpaceDev Dream Chaser concept

orb

New member
News Reporter
Joined
Oct 30, 2009
Messages
14,020
Reaction score
4
Points
0
NASASpaceflight: SNC Captive Carry test sees Dream Chaser take flight:
Sierra Nevada Corporation (SNC) took their spacecraft for a ride on Tuesday, allowing it to taste the Colorado air via a Captive Carry test near the Rocky Mountain Metropolitan airport. Lofted by a Sikorsky Skycrane helicopter, the Dream Chaser was being tested ahead of its debut Free Flight Test later this year.

{...}
 

Zachstar

Addon Developer
Addon Developer
Donator
Joined
May 1, 2008
Messages
654
Reaction score
0
Points
0
Location
Shreveport, Louisiana
Website
www.ibiblio.org
This craft shows a great deal of promise. If they continue to meet objectives along with SpaceX I think both should be funded for operations to the International Space Station.

The reason is redundancy. Lets say Falcon 9 or Atlas 5 is grounded for a year. The other can then easily cover meaning 6-7 man crews on the ISS are never reduced.

However, The chances of this happening are slim because congress continues to go cheap on the funds to this program. And it shows in the article earlier. They are signaling that if congress continues to try to force NASA to pick the winners early through limited funding or outright rule changes. Then they will not spend a red cent wasting their time after their contract is up. Why should they when a forced buy will = SpaceX alone and assured?
 

orb

New member
News Reporter
Joined
Oct 30, 2009
Messages
14,020
Reaction score
4
Points
0
NASASpaceflight: SNC outline Dream Chaser’s Enterprise-style landing test approach:
Sierra Nevada Corporation’s Dream Chaser – one of the leading candidates to win the right to launch US astronauts to the International Space Station (ISS) – is heading towards its extensive Approach and Landing Test (ALT) schedule. Using the Engineering Test Article (ETA) as “their Enterprise”, the testing will ramp up towards crewed landings at Edwards Air Force Base.

{...}
 

orb

New member
News Reporter
Joined
Oct 30, 2009
Messages
14,020
Reaction score
4
Points
0

orb

New member
News Reporter
Joined
Oct 30, 2009
Messages
14,020
Reaction score
4
Points
0
Aviation Week: Sierra Nevada Advances Commercial Spaceplane

DreamChaser_SierraNevadaConcept.jpg
 

orb

New member
News Reporter
Joined
Oct 30, 2009
Messages
14,020
Reaction score
4
Points
0
NASASpaceflight: SNC building test schedule for Dream Chaser – Dryden Drop Tests upcoming:
Sierra Nevada Corporation (SNC) are in the process of creating a test flight schedule that will reach through to a debut mission for Dream Chaser’s arrival at the International Space Station (ISS). The plan – involving three versions of Dream Chaser – will next involve drop tests of their Engineering Test Article (ETA) at the Dryden Flight Research Center in California.

{...}

Parabolic Arc: Dream Chaser Drop Tests Due By End of March
 

orb

New member
News Reporter
Joined
Oct 30, 2009
Messages
14,020
Reaction score
4
Points
0
Parabolic Arc: Sierra Nevada to Announce Dream Chaser Program Expansion:
Sierra Nevada Corporation will be holding a press conference next Wednesday during which it will announce an expansion of its Dream Chaser shuttle program and provide a Commercial Crew Program update. Vice Presidents Mark Sirangelo and Jim Voss will speak along with others to be announced. The event will include a viewing of the Dream Chaser Engineering Test Article. It will take place and will take place at the company’s headquarters in Louisville, Colo.

{...}
 

Kyle

Armchair Astronaut
Addon Developer
Joined
Mar 17, 2008
Messages
3,912
Reaction score
339
Points
123
Website
orbithangar.com
Good news! The first ALT tests are going to be taking place within the next few weeks, the first flight tests will be 30-40 seconds max, basically just dropping and landing the ALT vehicle on the runway. That will be followed by piloted flights dropped from a helicopter at an altitude of 12,000 feet. Should be around 6 flight tests in total if all goes well. SNC teaming up with LM, will be using the facilities there such as MAF in the future. 25-30 mission lifespan for each DreamChaser vehicle (on pair with how many missions each Space Shuttle flew, though STS was designed for 100), with orbital test flights beginning in the 2016-2017 time frame.
 

Kyle

Armchair Astronaut
Addon Developer
Joined
Mar 17, 2008
Messages
3,912
Reaction score
339
Points
123
Website
orbithangar.com
More news coming in that the first ALT test will take place in early June, and that one of the Test Articles (ETA to be specific) is named "Eagle."
 

Kyle

Armchair Astronaut
Addon Developer
Joined
Mar 17, 2008
Messages
3,912
Reaction score
339
Points
123
Website
orbithangar.com
And here it is!
index.php


And here's the cockpit mockup with Rex at the helms.
index.php
 

orb

New member
News Reporter
Joined
Oct 30, 2009
Messages
14,020
Reaction score
4
Points
0
NASASpaceflight: Dream Chaser suffers landing gear failure after first flight:
Sierra Nevada Corporation’s Dream Chaser ETA (Engineering Test Article) conducted her maiden flight at the Dryden Flight Research Center on Saturday. However, the Commercial Crew prospect – after enjoying a perfect flight in the air – suffered a mechanical failure during landing, resulting in her flipping over on the runway.

{...}

Sierra Nevada Corporation: Statement from Sierra Nevada Corporation Regarding Dream Chaser© Free-Flight Test

Spaceflight Now: Dream Chaser damaged by crash landing in California

AmericaSpace: Dream Chaser Suffers Landing Gear Failure After First Free Flight Test

Space News: Dream Chaser Prototype Spaceship Damaged after First Free-flying Test

Universe Today: Dream Chaser spaceship test article damaged during 1st Free-Flight Drop Test

Spaceflight101: Dream Chaser Project set back by Landing Gear Failure during first Free Flight
 

Kyle

Armchair Astronaut
Addon Developer
Joined
Mar 17, 2008
Messages
3,912
Reaction score
339
Points
123
Website
orbithangar.com
Obviously there's probably a fairly hefty amount of damage, so I think we can rule out another flight for at least month or two.

I'd rather it be an engineering failure than a political failure. At least the forward can be fixed versus the latter.
 
Last edited:

reekchaa

Endeavoring Futurist
Joined
Apr 11, 2008
Messages
26
Reaction score
0
Points
0
Location
Hollywood Hills
The first person to find and post a VIDEO Link of this FLIP-over Landing wins a personal tip o' the hat from me! :tiphat:
 

Loru

Retired Staff Member
Retired Staff
Addon Developer
Donator
Joined
Sep 30, 2008
Messages
3,731
Reaction score
6
Points
36
Location
Warsaw
Epic win: furry dices in cockpit. They should be pink though.
 

RisingFury

OBSP developer
Addon Developer
Joined
Aug 15, 2008
Messages
6,427
Reaction score
492
Points
173
Location
Among bits and Bytes...
It comes down in a pretty steep glide slope. At least -20°, maybe more. Not surprising. It has essentially no wing area.
 
Top