Orbiter Screenshot Thread

Seems to be a bit deep in the PLB (or the sill pin is too low)


You could add a new attachment to the HST_EX.cfg if there isn't one to change.
 
My humble apologies !! The HST does indeed fit in the SSU PLB.

Love the shadow.
 

Attachments

  • HST shadow.jpg
    HST shadow.jpg
    85.2 KB · Views: 53
Quick sortie with the stock Deltaglider, I love this little ship :)

ctutTS4.jpg

9j2cTs1.jpg


good day !
 
Could you provide sample scenarios with BrianJ HST_EX and with the ORUC in the PB so that I can use them for HST missions?


Could anyone share a HST servicing mission scenario with the ORUC installed in the SSU PB?
 
Another Dragon2 HST servicing update.
 

Attachments

  • Dragon2 HST servicing.jpg
    Dragon2 HST servicing.jpg
    178.8 KB · Views: 53
Another Dragon2 HST servicing update.


Looks pretty feasible like that. Almost like from a NASA publication. You are not planning to write one, are you?
 
Looks pretty feasible like that. Almost like from a NASA publication. You are not planning to write one, are you?


No. That can be your job. ;)
 
No. That can be your job. ;)


Still sitting in a hotel here, 600 km away from home, trying to get a lousy diagram done after work. There are sure WAY smarter people around than I will ever be.
 
I see thanks, this is what they used for STS-61 too ?

Wolf, here's my own STS-61 mission for SSU with a launch scenario (didn't verified the launch parameters) and the one in already in orbit approaching HST (mision edited from ShuttleFleet for SSU).

I hope it works for you :)

https://www18.zippyshare.com/v/KHsFQIPT/file.html


Thank you very much Snax! I will try your scenario :thumbup:
 
Jumping on the Space Shuttle bandwagon...

picture.php


STS-92A launches from Vandenberg AFB on a commercial rideshare made up of GAS canisters

(MSL and SPAS stood in for GAS bridges as I don't think there's a stand-alone GAS bridge mesh)
 
Back
Top