D DaveS Addon Developer Addon Developer Donator Beta Tester Joined Feb 4, 2008 Messages 9,753 Reaction score 1,024 Points 203 Feb 7, 2008 #101 FES heater reconfig in work.
D DaveS Addon Developer Addon Developer Donator Beta Tester Joined Feb 4, 2008 Messages 9,753 Reaction score 1,024 Points 203 Feb 7, 2008 #102 LOX drainback have started. APU start complete, heater reconfig complete.
D DaveS Addon Developer Addon Developer Donator Beta Tester Joined Feb 4, 2008 Messages 9,753 Reaction score 1,024 Points 203 Feb 7, 2008 #103 GLS is GO for purge sequence 4.
D DaveS Addon Developer Addon Developer Donator Beta Tester Joined Feb 4, 2008 Messages 9,753 Reaction score 1,024 Points 203 Feb 7, 2008 #104 Aerosurface and SSME gimbal check complete. SSMEs now in start position.
D DaveS Addon Developer Addon Developer Donator Beta Tester Joined Feb 4, 2008 Messages 9,753 Reaction score 1,024 Points 203 Feb 7, 2008 #105 GLS is GO for ET LOX pressurization. C&W memory clear in work.
D DaveS Addon Developer Addon Developer Donator Beta Tester Joined Feb 4, 2008 Messages 9,753 Reaction score 1,024 Points 203 Feb 7, 2008 #106 GOX Vent Arm is now being retracted. Visors are down and O2 flow is in work. GLS is GO for ET LH2 pressurization.
GOX Vent Arm is now being retracted. Visors are down and O2 flow is in work. GLS is GO for ET LH2 pressurization.
D DaveS Addon Developer Addon Developer Donator Beta Tester Joined Feb 4, 2008 Messages 9,753 Reaction score 1,024 Points 203 Feb 7, 2008 #107 T-1 minute, SRB joint heaters have been deactivated.
D DaveS Addon Developer Addon Developer Donator Beta Tester Joined Feb 4, 2008 Messages 9,753 Reaction score 1,024 Points 203 Feb 7, 2008 #108 T-31 seconds and GLS is GO for autosequence start.
D DaveS Addon Developer Addon Developer Donator Beta Tester Joined Feb 4, 2008 Messages 9,753 Reaction score 1,024 Points 203 Feb 7, 2008 #109 LIFT-OFF!!!
D DaveS Addon Developer Addon Developer Donator Beta Tester Joined Feb 4, 2008 Messages 9,753 Reaction score 1,024 Points 203 Feb 7, 2008 #110 In the throttle bucket.
D DaveS Addon Developer Addon Developer Donator Beta Tester Joined Feb 4, 2008 Messages 9,753 Reaction score 1,024 Points 203 Feb 7, 2008 #111 GO at throttle-up.
D DaveS Addon Developer Addon Developer Donator Beta Tester Joined Feb 4, 2008 Messages 9,753 Reaction score 1,024 Points 203 Feb 7, 2008 #112 SRB sep!
D DaveS Addon Developer Addon Developer Donator Beta Tester Joined Feb 4, 2008 Messages 9,753 Reaction score 1,024 Points 203 Feb 7, 2008 #113 OMS assist in progress, two good engines.
D DaveS Addon Developer Addon Developer Donator Beta Tester Joined Feb 4, 2008 Messages 9,753 Reaction score 1,024 Points 203 Feb 7, 2008 #114 Two engine TAL.
cjp Addon Developer Addon Developer Donator Joined Feb 7, 2008 Messages 856 Reaction score 0 Points 0 Location West coast of Eurasia Feb 7, 2008 #115 :speakcool:!!!
D DaveS Addon Developer Addon Developer Donator Beta Tester Joined Feb 4, 2008 Messages 9,753 Reaction score 1,024 Points 203 Feb 7, 2008 #116 Negative return.
D DaveS Addon Developer Addon Developer Donator Beta Tester Joined Feb 4, 2008 Messages 9,753 Reaction score 1,024 Points 203 Feb 7, 2008 #117 FES activated.
D DaveS Addon Developer Addon Developer Donator Beta Tester Joined Feb 4, 2008 Messages 9,753 Reaction score 1,024 Points 203 Feb 7, 2008 #118 So far so good.
D DaveS Addon Developer Addon Developer Donator Beta Tester Joined Feb 4, 2008 Messages 9,753 Reaction score 1,024 Points 203 Feb 7, 2008 #119 Press to ATO.
D DaveS Addon Developer Addon Developer Donator Beta Tester Joined Feb 4, 2008 Messages 9,753 Reaction score 1,024 Points 203 Feb 7, 2008 #120 Single engine OPS3. Roll to heads-up in progress. Single engine Zaragoza, single engine press to MECO. Nominal shut-down plan, GO for the pitch, GO for the +X.
Single engine OPS3. Roll to heads-up in progress. Single engine Zaragoza, single engine press to MECO. Nominal shut-down plan, GO for the pitch, GO for the +X.