Launch Day STS 122 Atlantis

Status
Not open for further replies.
FES heater reconfig in work.
 
LOX drainback have started.
APU start complete, heater reconfig complete.
 
GLS is GO for purge sequence 4.
 
Aerosurface and SSME gimbal check complete. SSMEs now in start position.
 
GLS is GO for ET LOX pressurization. C&W memory clear in work.
 
GOX Vent Arm is now being retracted. Visors are down and O2 flow is in work.

GLS is GO for ET LH2 pressurization.
 
T-1 minute, SRB joint heaters have been deactivated.
 
T-31 seconds and GLS is GO for autosequence start.
 
In the throttle bucket.
 
GO at throttle-up.
 
OMS assist in progress, two good engines.
 
Two engine TAL.
 
Negative return.
 
FES activated.
 
So far so good.
 
Press to ATO.
 
Single engine OPS3. Roll to heads-up in progress.

Single engine Zaragoza, single engine press to MECO.

Nominal shut-down plan, GO for the pitch, GO for the +X.
 
Status
Not open for further replies.
Back
Top