The last XR5 payload mission has now docked with SSTV-01 and the unloading and attaching of the cargo pods to the cargo bay should be completed in a few hours. 3 additional XR5 refueling missions have been added to the timeline to top off our fuel tanks as well as restock the ISS. Unlike the Lunar Station, the ISS was not designed to refuel a ship as large as SSTV-01. So far the mission has gone very smoothly and no outstanding engineering issues are being worked at this time.
Several last minute personnel changes are being made in our passenger list, none for engineering reasons so the actual changes and their reasons will be noted only in the Captain's Log.
Mission timeline is as follows:
HUMONGOUS IMS shipbuilder
Several last minute personnel changes are being made in our passenger list, none for engineering reasons so the actual changes and their reasons will be noted only in the Captain's Log.
Mission timeline is as follows:
- T+18 days through T+19 days 3 XR5s carrying LH2 will launch and dock with SSTV-01 to top off the fuel tanks
- T+20 days 2 XR5s will launch and dock with SSTV-01 and our 36 passengers and their personal effects will be brought aboard and stored
- T+21 days Final engineering checks will be performed and go/no-go decision made for TJI
- T+22 days TJI will be performed using only the EHEs
- T+45 days MCC #3
- T+80 days MCC #4
- T+90 days Preliminary shaping burn for JOI
- T+100 days JOI
- T+101 days First orbital alignment burn with Europa
- T+105 days Second orbital alignment burn with Europa (if needed)
- T+110 days Europa Orbit Insertion (EOI)
- T+111 days Start Europa Station construction