All remaining activities leading up to the departure of SSTV-01 on mission #2 occurred when expected with no unplanned holds and we have now undocked from the Lunar Station. With no off-nominal activities occurring during our pre-launch preparations, the maturity of the processes and procedures at the Lunar Station for processing SSTV sized vessels is boding well for future SSTV activities. As a side note, SSTV-02 is nearly 80% complete as we depart for SSTV-01 mission #2.

The next 4 days will be very busy for the pilot and co-pilot as they plan and perform the TEI, shaping, and TJI burns. As in mission #1, all burns and real-time trajectory calculations will be performed on board SSTV-01 although the calculation of our departure date and initial mission milestones was performed by ground based calculations a few weeks ago.

Except for major milestone accomplishments, the Engineering Log will work on the principle of Negative Reporting.

All engineering boards are green at this time.

The remaining milestones for this mission:
  • T+1 Day Depart Lunar Orbit for a sling shot around Earth
  • T+2 Days Series of shaping burns will be performed to fine tune the alignment for the TJI burn and to reduce the delta V requirement for the TJI burn
  • T+3 Days TJI burn during sling shot around Earth
  • T+10 Days MCC #1
  • T+15 Days MCC #2
  • T+20 Days MCC #3
  • T+24 Days JOI burn
  • T+25 Days Arrival at Europa Station
  • T+30 Days Depart Europa Station for a sling shot around Jupiter
  • T+31 Days Trans Saturn Injection (TSI) burn during slingshot around Jupiter
  • T+45 Days MCC #4
  • T+75 Days MCC #5
  • T+105 Days MCC #6
  • T+130 Days Saturn Orbit Injection (SOI) burn
  • T+145 Days Arrival at Titan and begin construction of Titan Station
  • T+295 Days Departure from Titan Station
  • T+315 Days MCC #7
  • T+350 Days MCC #8
  • T+375 Days MCC #9
  • T+395 Days Arrival at Lunar Station and end of SSTV-01 Mission #2