- Joined
- Feb 4, 2008
- Messages
- 9,753
- Reaction score
- 1,024
- Points
- 203
Got it. Looks ery nice! Almost done adding handrails to the Side 1 platforms. Then I just need to perform final welding operations on the cryo lines and add the LOX line brackets on Side 2 and the MLP is done! Also just need to add the various OTV cameras and engineering film cameras.Done !