Space Agency has approved 2 extra STS mission, STS-29 and 30, that will precede STS-28.

Due to the excess of heating produced by the station, extra radiators are needed, but the space actually available on the trusses is not enough.
So the 2 shuttles will deliver to CSS 2 new trusses that will be interposed between the existent 2 and the P3/4 and S3/4 segments.

The 2 long duration missions will be very challenging: in fact it will be needed to remove and temporarly relocate the solar arrays yet installed, to allow the interposition of Extra-Truss 3 and 4.

Then STS-31 will then bring up the 1st set of radiators.

Finally STS-28, with the 4th set of solar arrays will visit the station, followed by STS-32 with the second set of radiators for the starboard side.
 