Search results

  1. Matte

    Software Orbiter and Macintosh

    Hello. i've just switched from Windows to Mac OSX. i bought a MacBook Intel Core 2 Duo 2,26 GHz Memory: 2 GB NVIDIA GeForce 9400M 256MB is there a way to run orbiter on this system with those specs? thanks for answer...i'd like to go on building Thrton's ISS :D
  2. Matte

    Problem ISS 2.5 by Thorton Quest problem

    hi all, i'm having a little problem during STS-104 mission. i attached Quest at the starboard side of Unity module during EVA-1, but as soon as i try to activate it with CTRL+SPACE, Orbiter crashes... do i have to attach all the N2 and O2 tanks before activating it? i know that the 3rd EVA of...
  3. Matte

    Support XPOP and HLVL modes for ISS 2.5

    hi again. i'm getting some trubles in using the CMG control with ISS 2.5; when CMG is enabled via END button, then i press basically the prograde command and the station puts itself in prograde mode leveld with the horizon, as it should be... when i try to activate the XPOP mode, it doesn't...
  4. Matte

    Support ISS solar array P6

    Hello. i'm flying mission STS-97 of ISS 2.5 by Thorton; i've just attached P6 atop Z1...but i'm noit able to activate it; i tried using the solar arrays manager as it is written in Doc PDF, but it seems i have no control of it even if an the manager the voice P6 is present...
  5. Matte

    General Question assembling International Space Station 2.5 by Thorton

    hi all! i'm assembling the ISS 2.5 by Thorton and crew. wel, i've yet finished a perfect STS-88 mission and mated Zarya to Unity; my next is STS-96 supply mission. however i have a question, mainly to Thorton, but if anyone has the answer please write. is it better, if assembling the station...
  6. Matte

    Hardware Video problems

    Good morning. from almost 2 weeks i have experienced a strange problem when playing games on my desktop, and mostly Orbiter, because of it's graphical load. Specs of my PC are in my signature. However the problem is that while i am playing, sometimes even as soon as i start a session, a green...
  7. Matte

    STS-29 with Truss S2

    <<STS-29 , 26 November 2010 , 06:03:56 UT>> Shuttle Atlantis lifted off tonight for rescheduled STS-29 mission to bring S2 extra truss to Celestia Space Station. The 7 crew members will perform a 14 days long-duration mission to interpose the new truss between the S1 and S3 trusses, to allow...
  8. Matte

    Problem CTD while loading / strange Log message

    it happens anytime i start session with this scenario. the problem is that the textures that the Log talks about are not present in the original package. this CTD started to happen 3 days a go after i had to hard-reboot my pc due to a freezing.
  9. Matte

    Extra STS mission scheduled

    Space Agency has approved 2 extra STS mission, STS-29 and 30, that will precede STS-28. Due to the excess of heating produced by the station, extra radiators are needed, but the space actually available on the trusses is not enough. So the 2 shuttles will deliver to CSS 2 new trusses that will...
  10. Matte

    CTV-01 test vehicle

    <<CTV-01 , 01 November 2010>> LIFTOFF. The first vehicle of the CTV serie blasted off aboard an Ariane 5 from Kourou this morning (local time). CTV-01 is unmanned. It is the 1st of 2 unmanned flight that will test deeply all the systems. Mission duration is 2 days, and will end with reentry...
  11. Matte

    STS-27 with S5 and MPLM-2

    <<STS-27 , 25 October 2010 , 10:25:00 UT>> Space Shuttle discovery lifted off on mission STS-27 to deliver starboard adapter S5 that will allow attachment of the final array set in early 2011, and MPLM-2 that will substitute MPLM-1 as a storage module with a capability of fuel storage of 1000...
  12. Matte

    Question Would it be possible to create a GyroscopeMFD

    ...an MFD that simulate the presence of gyroscopes aboard a vessel to stabilize, let's say, a station built in LEO with several modules? or modifications to do in .cfg to stabilise the complex in flight? attitude MFD for big complexes like ISS-like assembled station works bad... too much fuel...
  13. Matte

    PROGRESS-06

    <<Progress-06 , 15 September 2010 , 21:46:28 UT>> Progress-06 lifted off from Baikonur Cosmodrome this evening for the 6th resupply mission to CSS. It will deliver supplies in preparation for arrival of Discovery's STS-27 mission in late October, and fuel for CSS and for the upcoming MPLM...
  14. Matte

    Expedition 5 aboard Soyuz-06

    <<Soyuz-06 , 10 August 2010>> The Soyuz vector is raised in the vertical position 24 hours before liftoff. Expedition 5 commander Virdis and cosmonaut Gregorij will join Exp.4 aboard CSS and will soon take command of the station. <<Soyuz-06 , 11 August 2010 , 05:53:53 UT>> Soyuz-06 with...
  15. Matte

    STS-26 with P6 and ARM-2

    <<STS-26 , 01 Aug 2010 , T -00h:09m:00s>> STS-26 is now sitting on pad 9 minutes bifore launch. Liftoff will occur at 10:38:08 UT. It is the riturn at flight of Endeavour Space Shuttle after the landing accident that damaged the orbiter at the end of STS-20 mission, more than 12 month ago...
  16. Matte

    Soyuz-04 returns back

    <<Soyuz-04 , 13 July 2010>> Soyuz-04 brought Expedition 3 crew on the ground 600 km east of Baikonur. Cosmonaut Ilushin and miss.spec.Sharon left comm. Finch and comm. Yegorov on the Station; they'll come back to Earth as Expedition 4 crew with Soyuz-05 as soon as Soyuz-06 with Expedition 5...
  17. Matte

    Question Pegasè addon UMMU crew

    Hello. Is it poossible to change names of the crew members of the great CTV Pegasè by Well and NoMatter? how? :( thanks Matte
  18. Matte

    New Crew Transportation program started

    A new Crew Transportation Vehicle will soon replace the Soyuz for european orbital journeys to and from the Celestia Space Station. Maiden manned flight is scheduled for 2010 fall. The first operational flight to the station is scheduled for mid 2011 to relieve Expedition 8 resident crew...
  19. Matte

    STS-25 with P5 segment and MPLM-1

    <<25 May 2010 , T +00h:00m:03s>> Space Shuttle Atlantis lifted off this afternoon on mission STS-25, to deliver P5 segment that will allow attachment of another solar array on the port truss in the future, and MPLM-1 a temporary storage module for fuel and rubbish. Secondary task of the mission...
  20. Matte

    PROGRESS-05 arrives at the station.

    <<Progress-05 , 21 March 2010>> Progress-05 arrived at the Celestia Space Station, delivering food supplies, water, oxygen and fuel for the control systems of the complex. Launch occured in the afternoon of the 19th. <<Progress-05 Update , 30 June 2010>> Progress-05 ferry undocked early this...
Top