Someone has made SSV-specific checklists, but as I have flown more missions, I've come to realize that the real shuttle checklists are better. No disrespect to the ones made for SSV, but once you get a feel for what is and isnt in SSV, you can use real ones no issue. and the flow of some of those can be hard or confusing. For example, the Post Insertion checklist has steps for KU Deploy, Activation, and Stow all back to back. Ive seen a few instances of people just going through each step and at the end of PI, the rads and KU are stowed since those procedures are all in there.
As for the MFD, there are multiple pages for the OMP that are good to have up at the same time for calculating and checking maneuvers. And the saving is to not overwrite the base plan so you can fly the mission again, since as the flight goes you will edit maneuvers and delete old ones and such.