T-5 hours and holding - Engineering Log

Dantassii

HUMONGOUS IMS shipbuilder
Joined
Jul 14, 2012
Messages
508
Reaction score
20
Points
33
Location
Somewhere.... out there.....
Preferred Pronouns
he/him
SSTV-01 is now on full internal resources. Topping off of the supplies was completed by T-17 hours and the shutdown of the hydroponics and life support modules was started on schedule at T-10 hours.

Shutdown of the hydroponics and life support modules is taking longer than anticipated due to a shortage of available Lunar Station personnel. Of the 45 Lunar Station personnel expected to be available for module shutdown, only 30 were actually available at T-10 hours. The remainder are on mandatory rest and downtime duty due to extra hours worked to get the SSTV-01 ready prior to countdown start.

The countdown is on hold at T-5 hours until all the modules are secured. As there are plenty of windows available for the TEI burn over the next 2 weeks, holding at this point in the countdown is not an issue.

Once the countdown picks up, the following events will occur:
  • T-5 hours All non-SSTV-01 crew will disembark to the Lunar Station
  • T-4 hours Laboratory and engineering modules will be shut down
  • T-3 hours All unneeded cooling modules will be shut down
  • T-2 hours All SSTV-01 crew will be on-deck and available for launch
  • T-0 Disconnect from Lunar Station and officially begin SSTV-01 Mission #1

All boards show green at this time.
 
Back
Top