Dantassii
HUMONGOUS IMS shipbuilder
- Joined
- Jul 14, 2012
- Messages
- 508
- Reaction score
- 20
- Points
- 33
- Location
- Somewhere.... out there.....
- Preferred Pronouns
- he/him
Loading of cargo modules is proceeding ahead of schedule at this time. A scheduled 'day of rest' today will limit the amount of cargo modules docked today. The leak sensor that was replaced several days ago has been tested and is definitely defective. A replacement for the spare that took its place will be brought up on 1 of the XR5 flights tomorrow so that our spares store is at 100% before TJI.
All boards are green at this time.
Mission timeline is as follows:
All boards are green at this time.
Mission timeline is as follows:
- T+5 days through T+18 days A total of 18 XR5 flights (from 6 XR5s) will be performed from various spaceports around the globe to bring up cargo modules and fuel.
- T+20 days 2 XR5s will launch and dock with SSTV-01 and our 36 passengers will be welcomed aboard.
- T+21 days Final engineering checks will be performed and go/no-go decision made for TJI.
- T+22 days After several hours of calculations for a 100 day trip to Jupiter, the TJI burn will be performed using only the EHEs.