T+ 15 Days Engineering Log

Dantassii

HUMONGOUS IMS shipbuilder
Joined
Jul 14, 2012
Messages
508
Reaction score
20
Points
33
Small glitch in one of the EHEs that was going to be used for MCC #2 required that we use one of the other EHEs. We will be using the next 9 days to determine if the glitch can be fixed or will permanently remove the EHE from use for the remainder of our mission.

MCC #2 was a little larger than expected at 210 m/s. MCC #3 looks to be around 500 m/s at this time. The JOI burn is still going to be a big one, but we should be able to make our meeting with Europa 1/4th of an orbit after JOI at which point we will make an Europa Orbit Insertion (EuOI) burn of about 45 seconds duration.

Except for EHE #3, all boards are green at this time. EHE #3 is Red.

The remaining milestones for this mission:
  • T+20 Days MCC #3
  • T+24 Days JOI burn
  • T+25 Days Arrival at Europa Station
  • T+30 Days Depart Europa Station for a sling shot around Jupiter
  • T+31 Days Trans Saturn Injection (TSI) burn during slingshot around Jupiter
  • T+45 Days MCC #4
  • T+75 Days MCC #5
  • T+105 Days MCC #6
  • T+130 Days Saturn Orbit Injection (SOI) burn
  • T+145 Days Arrival at Titan and begin construction of Titan Station
  • T+295 Days Departure from Titan Station
  • T+315 Days MCC #7
  • T+350 Days MCC #8
  • T+375 Days MCC #9
  • T+395 Days Arrival at Lunar Station and end of SSTV-01 Mission #2
Dantassii
HUMONGOUS IMS shipbuilder
 
Top