Dantassii
HUMONGOUS IMS shipbuilder
- Joined
- Jul 14, 2012
- Messages
- 508
- Reaction score
- 20
- Points
- 33
MCC #1 was performed with 2 forward and 2 reverse EHEs with no flags reported. The delta V for this burn was only 15 m/s. Currently on-board calculations show MCC #2 to be about 150 m/s and MCC #3 around 350 m/s. The JOI burn will be another long burn so we will probably use all of the EHEs to keep the duration to a reasonable value. The G forces during the JOI burn may reach as high as 6 Gs. We will reduce the thrust of the EHEs during that burn to keep the Gs under that value.
All boards are green at this time.
The remaining milestones for this mission:
Dantassii
HUMONGOUS IMS shipbuilder
All boards are green at this time.
The remaining milestones for this mission:
- T+15 Days MCC #2
- T+20 Days MCC #3
- T+24 Days JOI burn
- T+25 Days Arrival at Europa Station
- T+30 Days Depart Europa Station for a sling shot around Jupiter
- T+31 Days Trans Saturn Injection (TSI) burn during slingshot around Jupiter
- T+45 Days MCC #4
- T+75 Days MCC #5
- T+105 Days MCC #6
- T+130 Days Saturn Orbit Injection (SOI) burn
- T+145 Days Arrival at Titan and begin construction of Titan Station
- T+295 Days Departure from Titan Station
- T+315 Days MCC #7
- T+350 Days MCC #8
- T+375 Days MCC #9
- T+395 Days Arrival at Lunar Station and end of SSTV-01 Mission #2
Dantassii
HUMONGOUS IMS shipbuilder