- Joined
- Aug 5, 2008
- Messages
- 4,261
- Reaction score
- 1
- Points
- 0
NASASpaceFlight: "ETCS Pump Module changeout success following epic ISS EVA".
Florida Today's "The Flame Trench" Blog: "Station coolant system back in business after third spacewalk".
Tracy & Doug will probably do one more EVA to install a PDGF on of FGB, and install a cable on Node 1 for the PMM.
This means that Tracy will have some nice EVA experience for an assignment to STS-135! :thumbup:
---------- Post added at 08:18 PM ---------- Previous post was at 07:36 PM ----------
Spaceflight Now: "Spacewalkers complete space station cooling repairs".
BBC News: "Space station crew replace pump on third spacewalk".
Downloadable video of the EVA.
Downloadable video of the post-EVA briefing.
Florida Today's "The Flame Trench" Blog: "Station coolant system back in business after third spacewalk".
Tracy & Doug will probably do one more EVA to install a PDGF on of FGB, and install a cable on Node 1 for the PMM.
This means that Tracy will have some nice EVA experience for an assignment to STS-135! :thumbup:
---------- Post added at 08:18 PM ---------- Previous post was at 07:36 PM ----------
Spaceflight Now: "Spacewalkers complete space station cooling repairs".
BBC News: "Space station crew replace pump on third spacewalk".
Downloadable video of the EVA.
Downloadable video of the post-EVA briefing.
Last edited:
to the successful EVA!!!