Project Mir station complex / UR-500 family

unexpected problem, lag occurs during booster separation there is also a lag when separating the fairing
4554.jpg
 
Yes, both APAS units on the Docking Module were of the Active version despite the orbiters already having one of their own. Same thing with the Kristall module, APAS-95 Active there as well.
Thanks. I can add those to the DM. I guess the orientation is the same ends? Looks like one end is 120 degrees off form the other?
 

Attachments

  • dmside.jpg
    dmside.jpg
    138.7 KB · Views: 7
Last edited:
Thanks. I can add those to the DM. I guess the orientation is the same ends?
No, rotated 180°s. The FWD end (the one with the RMS grapple fixture) has the No.3 guide petal on the bottom while the aft end has it on the top.
 
Thanks. That is the ODS, right. Be nice if moveable docks worked. Making the animations work is one thing. I have seen where moveable dock need to be done.
 
I still need to wait for the release "Orb2016 VesselM Pack: Historical Spaceports" addon adds surface textures for Baikanur
 
Back
Top