STS 88: New Era of Space Exploration ( Mission Sum up )

Gingin

Member
Joined
Feb 5, 2015
Messages
270
Reaction score
23
Points
18
Location
City of Light
Hello,

I just completed Sts 88 mission from the Iss AtoZ Add on https://www.orbiter-forum.com/showthread.php?t=26673
I attached in the poste the link of a modified STS 88 scenario that works for SSU 5 and Orbiter 2016.

What a nice bunch of Add Ons. It is so nice to be able to reproduce those historical missions that made the History.


For more immersion, you can have a look to the STS 88 Press Kit, well done : https://www.jsc.nasa.gov/history/shuttle_pk/pk/Flight_093_STS-088_Press_Kit.pdf

Time Line was delayed by two days due to launch Abort.
I tried to follow the real time line as close as possible with a Rendez Vous on Day three with kind of real Nasa way to perform a Rendez Vous Phasing and burn wise.

Let's jump into the story


1200px-Sts-88-patch.png








I)From Launch To Meco




After several Launch Posponements due to various Reasons ( Hydraulic problems and Launch Window expiration on the last attempt the 03/12), Endeavour was finally Launched the 4th of December 1998 by Night, 08h35mn UTC)



Endeavour on the pad

JLEwPf.jpg




Liquid Oxygen venting

CMD6HR.jpg




APU started,LOX Hood removal, Launch is getting closer and no Hydraulics Master Alarm this time

nOUCfS.jpg





Lift Off of the first mission towards ISS and the Russian Module Zarya, First stage nominal

6yEQiJ.jpg






SRB separation, and second stage for 6 mn before MECO

kNY7Uk.jpg





MECO on time, no underspeed.
Propellant dump begins and we can see some propellant from External Tank being vented to increase the separation and avoid re contact with the Shuttle


GFAKYk.jpg









II)From MECO To Unity Docking


Zarya is 40 ° in front of us.
Aim is to perform a rendez vous during start of day 3.
We will pass behind her a first time then come back after a full circle, it will be a 400 ° phasing on 3 days


One important thing for our goal will be the phasing, to know how much degrees we catch up on Zarya every Orbit.
A very useful graph to help us:


Fekgrf.jpg




Back to the work

Safely into Orbit now.
Next step will be to raise the Perigee with an OMS 2 burn performed at next Apogee in less than 40 mn


We will circularize the orbit, 124 x 122 Nm to start with. It will give us a 15 ° phase ( 15 ° of catch up every orbit)
A fast rate that we will modulate later to slow down.


cOuslW.jpg





Post insertion actions are performed waiting for the burn, Like the closing of ET door with a nice back ground

UQnfc5.jpg






OMS 2 burn in action

rQjwZB.jpg








Let's start the phasing with a couple of burns
We want to decrease the catch up rate around 10 ° and have the same line of apside than ISS for easiest Rendez Vous.
A 10 ° phase will bring us at the end of day 2 close to ISS to start the final orbit adjustement and the rendez vous.
Roughly 37 Orbit to go.

We will then raise the orbit to 154 Nm, almost circular.

Those Phase Adjust Maneuver are called NC1 and performed on target line of apside ( here Zarya Apogee)



NC1 burn raising the apogee at 154 Nm


JEmR2Y.jpg






NC1-1 burn half an orbit later to raise the Perigee to 153 Nm

uXXWmc.jpg





Here we are, 9 ish ° of catch up rate on a 154 x 153 Nm orbit sharing same Line of Apsides than Zarya

8TPh88.jpg





Time to Deploy the radiators and checked the RMS
A bit of work for the mission specialist


3rBRzV.jpg





RMS checked and unstowed

rlwIqR.jpg






Camera OK

EdiGdm.jpg




Ready to rock for orbital operations

M86EYx.jpg








More than a day in Space already

Next burn, the Plane change burn PC to make fully coplanar at a node Chaser and target orbit.
RInc is very low due to a good launch window ( 0.02°) and hopefully. We could barely change by more than one degree the inclination with all the propellant available in the Shuttle :)


Out of Plane (DVy) PC burn

UJlY7W.jpg






Perfect, phasing is done and Orbit are now coplanar.
We jsut have tot check time to time if we need some corrections to keep Line of node and apsides the same ( due to Non Spherical Gravity or radiation pressure)


Time to Unberth Unity


Not the easiest task that RMS

f1wMSS.jpg




Joint Coordinates for Unity: Shoulder YAW: -31.16 PITCH: +85.313 Elbow PITCH: -128.6 Wrist PITCH: -74.64 ROLL -216.1 YAW +2.848




QsyYVW.jpg





Let's dock it to the ODS, not an easy task easier, fine tunning and it works :)



e8cOxc.jpg





Joint Coordinates for Unity docked to ODS: Joint Coordinates for Unity: Shoulder YAW: -26.10 PITCH: +113.7 Elbow PITCH: -46.1
Wrist PITCH:-90.15 ROLL :-372.1 YAW -49.44







III)Rendez vous with Zarya




It will be a bit more numerical part now for the final phase of Rendez Vous.



MET 002 /21:16:12
Zaria is closing in, we are just a few degrees behind her.

It is time to stop the phasing phase and reduce greatly the catch up rate to prepare for the final rendez vous phase.


Next burn will be the Height Adjustement ( NH) Burn, raising the apogee within 10 Nm of the target ship.



NH1 Burn, Raising the Apogee to 203 Nm ( it will be the new Perigee later on, 7 Nm below Zarya Perigee of 210 Nm)

o2lqHp.jpg






NH2 burn 45 mn later, to raise the orbit to 218 x 203 Nm
Same apogee than Zarya and lower Perigee for a shallower catch up rate ( less than a degree/orbit of catch up rate now)

mFu0me.jpg




The result here, 400 m (1200ft) below Zarya at Apogee.
NC burn is nicely coming alive now



oEYQFs.jpg







Alright, almost there.
Now, it is time for Onboard targeted burn based on onboard sensor data ( Star tracker, ranging Radar, COAS eventually)

The aim now is to be in two Orbit below Zarya , on the R bar

Several Burn will happen, NC, NCC, Ti, MC 1 to 4



Here the Theory


jJsFEm.png



GaTyPa.png




Aim is to be 250 kfeet ( 76 km) behind Zarya at next apogee, then one more orbit , and we should be at 50 kfeet ( 14 km ) behind it for Terminal Initiation burn.


What I got in reality after those burn

c18Xgx.jpg



Spec 34 tool is really well coded and useful if the phasing and height adjustement was properly done. I was a bit close for Nc burn ( 200 kfeet instead of 250 kfeet, but not a big deal, just a less fuel efficient), but the rest of maneuver was very close to the books.



Let's go for the NC burn, we want to be at next apogee ( 91.6 mn period) 48.6 kft behind Zarya (Dx - 48.6), in plane ( Dy 0) and 1200 feet below ( Dz-1.2)




7zyvyf.jpg



Small Dv, Perigee raised to 206 Nm


1MsVEN.jpg






NCC burn then. It is a corrective combination that occurs before the next Perigee ( 57.7 mn before next Apogee)
Aim is still the same, to be in a good position at next Apogee for Ti burn.


Dv are very small, either RCS or multi axis burn with Translation RCS. No need for OMS burn at that stage.
Really fine tunning.

IZy3RT.jpg






Closing in with the next Apogee.
At this stage, either we delay the Rendez Vous by phasing again ( increased Perigee to jave a negative catch up rate) or we go for the Terminal Initiation burn that will lead us to a direct intercept.

The aim here is to be in a good position for the final MC4 burn 320 ° later ( 76.9 mn)
At that point, we want to be 900 feet behind Zarya ( Dx -0.9) and 1800 feet below (Dz +1.8)



lZDrdE.jpg



Then 3 Mid course correction to affinate our MC4 Goal.


MC1 not needed

QctNP6.jpg





Very small Multi Axis MC2 ( normally burn is not programmed at a specific time , but when Elevation angle between Orbiter's local horizontal and Los to the target vehicule is 28 °)


mkONYQ.jpg






We start to see Zarya in the Back ground :)

dYcVpx.jpg





Another small correction for MC 3


NOH38b.jpg






MC 4 burn now, 15 mn before Apogee and Rendez vous.
Aim now is to be right below Zarya ( 600 feet, Dz=+0.6) on the R bar in 15 mn.



2tdywM.jpg





Here the results after 3 days of orbiting the Earth.
Dtmin of zero, encounter in 15 mn, almost on the same orbit.
I am really amazed by how Spec 34 tool is useful.


3qB4py.jpg







Zarya, here we come



JGFO9R.jpg













IV) Proximity Operations





Finally phase of the Rendez vous, the R bar approach, and station keeping by nullying any residual velocity.



W63gsT.jpg





Univ Pointing will help us to track the center of Earth and maintain level wings for a perfect R bar Approach
We can focus on translation only and final approach


HnPVME.jpg




Breathtaking, just no words in front of those scenics

yqSZlH.jpg





Station keeping, RMS work incoming

oCFOpP.jpg





After pain and tears, Zarya is finally docked to the Unity module


dJQXGN.jpg






Farewell ISS, see you soon


S9HAuC.jpg





Igc2zD.jpg
 

Snax

Space Cowboy
Joined
Jun 20, 2018
Messages
214
Reaction score
151
Points
58
Location
Brussels
Very nice Gingin ! It's like reading these flight reports in aviation !
 

Donamy

Addon Developer
Addon Developer
Donator
Beta Tester
Joined
Oct 16, 2007
Messages
6,906
Reaction score
201
Points
138
Location
Cape
You meant SSU 4.2 correct ?
 

Donamy

Addon Developer
Addon Developer
Donator
Beta Tester
Joined
Oct 16, 2007
Messages
6,906
Reaction score
201
Points
138
Location
Cape
The payload needs to move back in the bay.
 

Abdullah Radwan

Addon Developer
Addon Developer
Joined
Aug 20, 2017
Messages
314
Reaction score
284
Points
78
Location
Cairo
Thanks for your amazing reports!

Could you post STS-88 scenario? I couldn't find it in ISS A2Z thread.
 

Wolf

Donator
Donator
Joined
Feb 10, 2008
Messages
1,091
Reaction score
11
Points
38
Location
Milan
Thanks for your amazing reports!

Could you post STS-88 scenario? I couldn't find it in ISS A2Z thread.


You can find launch scenario in the SSU scenarios/historic missions folder.


I have edited it with the Zarya TLE for the launch date. if you wish I can share that

---------- Post added at 08:38 PM ---------- Previous post was at 08:27 PM ----------

That is great Gingin! nice to see you back here.
I got some questions for you:

1) Your MECO orbit is quite different from the nominal one: that resulted in a 170x40 NM orbit while yours is 122x31 NM. If you used the original data in the SSU mission file you should get something close to the nominal (actual MECO orbit). Did you change your MECO values instead and if so why?

2) Same for post OMS-2 burn: the actual orbit should be 175x97 NM (yours is 123x121)

Could you post all the phasing (NC,NH,OOP) and rendezvous (NCC,MC,Ti) burns that you made with the following data:


-Type of burn (Prograde-multiaxis)
- Dvx-Dvy-Dvz and DvTot
- Burn MET

- Post Burn Orbits (ApA and PeA following the burn)

Thanks
 
Last edited:

Gingin

Member
Joined
Feb 5, 2015
Messages
270
Reaction score
23
Points
18
Location
City of Light
Hey Wolf.
For Insertion and OMS, I took some liberties to work on phasing and make some tests on catch up rate etc:)

I already posted all the burns I made with a picture of OPS202 page where you can see all the data you want .

In Order: OMS 2, 2 phasing burn NC1 and NC2. One OOP. 2 Height adjustment burns NH
And final phasing NC burn followed by onboard lambert targeted burn NCC up to MC 4
 

Wolf

Donator
Donator
Joined
Feb 10, 2008
Messages
1,091
Reaction score
11
Points
38
Location
Milan
Hey Wolf.
For Insertion and OMS, I took some liberties to work on phasing and make some tests on catch up rate etc:)

I already posted all the burns I made with a picture of OPS202 page where you can see all the data you want .

In Order: OMS 2, 2 phasing burn NC1 and NC2. One OOP. 2 Height adjustment burns NH
And final phasing NC burn followed by onboard lambert targeted burn NCC up to MC 4

Thanks. So you edited the SSU Mission file with new MECO values I guess. Did you change the MECO speed and FPA?
As far as Zarya’s state vectors at launch date did you use the default scenario ones?
 

Gingin

Member
Joined
Feb 5, 2015
Messages
270
Reaction score
23
Points
18
Location
City of Light
I just touched the mission config file I think I copied paste Sts 127 mission config to have endeavour element, and I forgot to modify MECO value originally.

I didn’t touch anything for Zarya.
So after Launch, it was like the original scenario. Same plane than Zarya , 50 degrees behind :)
 

Sbb1413

Well-known member
Joined
Aug 14, 2018
Messages
948
Reaction score
373
Points
78
Location
India
Preferred Pronouns
he/his/him
How do you get SSU 5.0?
 
Last edited:

GLS

Well-known member
Orbiter Contributor
Addon Developer
Joined
Mar 22, 2008
Messages
5,914
Reaction score
2,908
Points
188
Website
github.com
How do you get SSU 5.0?

You don't, because it hasn't been released as it isn't ready. Meanwhile you can access the source code and compile a version yourself.
 

Wolf

Donator
Donator
Joined
Feb 10, 2008
Messages
1,091
Reaction score
11
Points
38
Location
Milan
You don't, because it hasn't been released as it isn't ready. Meanwhile you can access the source code and compile a version yourself.

I think Snax released a SSU 5.0 file already compiled that you just add to your Orbiter install, ready for use. Maybe people can use that if they want to skip the PIA of compiling SSU themselves
 

Gingin

Member
Joined
Feb 5, 2015
Messages
270
Reaction score
23
Points
18
Location
City of Light
Yes, It can be a nice Pre compiled Beta of SSU 5.
We can Maybe put it somewhere in a sticky post
 

Sbb1413

Well-known member
Joined
Aug 14, 2018
Messages
948
Reaction score
373
Points
78
Location
India
Preferred Pronouns
he/his/him
Re: STS 88: New Era of Space Exploration (Mission Sum up)

Until SSU 5.0 is ready, I will recreate the mission with Stock Atlantis.
 

Gingin

Member
Joined
Feb 5, 2015
Messages
270
Reaction score
23
Points
18
Location
City of Light
You should PM Snax for a zip version of SSU 5.0.

It is already good enough and versatile to be used now ;)
 

GLS

Well-known member
Orbiter Contributor
Addon Developer
Joined
Mar 22, 2008
Messages
5,914
Reaction score
2,908
Points
188
Website
github.com
You should PM Snax for a zip version of SSU 5.0.

It is already good enough and versatile to be used now ;)

Except it doesn't land right and has mesh issues... :shrug:
 

Wolf

Donator
Donator
Joined
Feb 10, 2008
Messages
1,091
Reaction score
11
Points
38
Location
Milan
Except it doesn't land right and has mesh issues... :shrug:


BTW would the new entry guidance system be available for an svn update?
I am looking forward to test a full reentry and autoland myself :cool:
 

GLS

Well-known member
Orbiter Contributor
Addon Developer
Joined
Mar 22, 2008
Messages
5,914
Reaction score
2,908
Points
188
Website
github.com
BTW would the new entry guidance system be available for an svn update?
I am looking forward to test a full reentry and autoland myself :cool:

It's in the OrbitersimBeta branch... save/loads might not work yet.

---------- Post added at 12:57 PM ---------- Previous post was at 12:55 PM ----------

Argh, it lands ok manually :)

Ahah, a christmas SVN update :hail:

It does so for sometime now... there's just tons of (small) things missing.
 
Top