Orbiter-Forum  

Go Back   Orbiter-Forum > Blogs > Dantassii
Register Blogs Orbinauts List Social Groups FAQ Projects Mark Forums Read

Rate this Entry

T+ 136 Days Engineering Log

Posted 01-31-2014 at 08:51 PM by Dantassii
Tags sstv

After 10 days of construction the Europa L2 station is starting to take shape. The temporary docking port for the ETV has been assembled and we await the arrival of the ETV with the components necessary to repair the failed EHEs.

With exception of the failed EHE's all boards are green at this time.

Mission timeline is as follows:
  • T+145 days ETV JOI burn
  • T+155 days ETV arrives in Europa orbit
  • T+200 days ETV leaves Europa orbit for Earth
  • T+220 days ETV arrives in LEO
  • T+250 days Europa Station construction complete
  • T+260 days SSTV-01 departs Europa Station after refueling
  • T+275 days TEI
  • T+300 days MCC #5
  • T+350 days MCC #6
  • T+365 days Preliminary shaping burn for EOI
  • T+375 days EOI and docking with ISS
  • T+390 days Undocking and TLI
  • T+393 days LOI and docking with lunar station and official end to mission #1
Dantassii
HUMONGOUS IMS shipbuilder
« Prev     Main     Next »
Total Comments 0

Comments

 

All times are GMT. The time now is 05:06 AM.

Quick Links Need Help?


About Us | Rules & Guidelines | TOS Policy | Privacy Policy

Orbiter-Forum is hosted at Orbithangar.com
Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2019, Jelsoft Enterprises Ltd.
Copyright 2007 - 2017, Orbiter-Forum.com. All rights reserved.