Orbiter-Forum  

Go Back   Orbiter-Forum > Blogs > Dantassii
Register Blogs Orbinauts List Social Groups FAQ Projects Mark Forums Read

Rate this Entry

T+ 360 Days Engineering Log

Posted 09-17-2014 at 10:49 PM by Dantassii
Tags sstv

The first 14 shaping burns were performed today without any issued with the EHEs. Several loose items rattled around inside of 1 of the maintenance modules which caused some damage to fixtures inside the module, but no hull penetration occurred.

It is expected that we will perform 10-16 shaping burns of 2 to 5 minutes each over the next 15 days until our EOI burn on T+375 Days in the mission.

All boards are green at this time.

Remaining mission timeline is as follows:
  • T+375 days EOI and docking with ISS
  • T+390 days Undocking and TLI
  • T+393 days LOI and docking with lunar station and official end to mission #1
Dantassii
HUMONGOUS IMS shipbuilder
« Prev     Main     Next »
Total Comments 0

Comments

 

All times are GMT. The time now is 08:19 AM.

Quick Links Need Help?


About Us | Rules & Guidelines | TOS Policy | Privacy Policy

Orbiter-Forum is hosted at Orbithangar.com
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2020, vBulletin Solutions Inc.
Copyright 2007 - 2017, Orbiter-Forum.com. All rights reserved.