Orbiter-Forum  

Go Back   Orbiter-Forum > Blogs
Register Blogs Orbinauts List Social Groups FAQ Projects Mark Forums Read

Space Flight Blogs Real life space flight blogs.
Old

T-0 Mission Start Engineering Log

Posted 02-07-2015 at 11:27 AM by Dantassii
Tags sstv

All remaining activities leading up to the departure of SSTV-01 on mission #2 occurred when expected with no unplanned holds and we have now undocked from the Lunar Station. With no off-nominal activities occurring during our pre-launch preparations, the maturity of the processes and procedures at the Lunar Station for processing SSTV sized vessels is boding well for future SSTV activities. As a side note, SSTV-02 is nearly 80% complete as we depart for SSTV-01 mission #2.

The next...
HUMONGOUS IMS shipbuilder
Views 1174 Comments 0 Dantassii is offline
Old

T-24 Hours Engineering Log

Posted 02-06-2015 at 10:44 AM by Dantassii
Tags sstv

The remaining 2 XR5s that are not going with us to Titan have just departed after the last cargo modules have been attached to our cargo array. All fuel tanks are still in topping off mode and we are at 90% capacity on supplies generated by our hydroponics and life support modules. When we reach 100% capacity, we will begin shutting down the modules in preparation of our TEI burn.

Due to the length of our Earth sling-shot burn to get us to Europa in 25 days, and the busy schedule...
HUMONGOUS IMS shipbuilder
Views 1321 Comments 0 Dantassii is offline
Old

T-48 Hours Engineering Log

Posted 02-05-2015 at 10:21 AM by Dantassii
Tags sstv

All fuel tanks have been filled successfully and are now topping off until launch. The last 6 XR5s bringing payload and passengers arrived on schedule and attaching the last payload modules to our cargo bay has been progressing nominally. The 2 XR5s we will be taking to Titan have been docked and our passengers have settled into their quarters. There are 2 remaining XR5s with cargo pallets to unload.

Our launch preparation schedule is different from Mission #1 due to lessons learned...
HUMONGOUS IMS shipbuilder
Views 1422 Comments 0 Dantassii is offline
Old

T-72 Hours Engineering Log

Posted 02-04-2015 at 10:57 AM by Dantassii
Tags sstv

The countdown for SSTV-01 mission #2 has begun.

Our mission plan has changed somewhat from what was expected at the end of mission #1.

3 of the crew members from Mission #1 who are currently at Europa Station will be needed at Titan to help construct the Titan Station. To pick them up, we will be making a rapid 25 day transit from the Moon to Europa. After refueling at Europa, we will transit from Europa to Saturn. Since Saturn and Jupiter are on opposite sides of the...
HUMONGOUS IMS shipbuilder
Views 1272 Comments 0 Dantassii is offline
Old

T+ 398:07:59:30 Engineering Log

Posted 10-26-2014 at 12:05 PM by Dantassii
Tags sstv

SSTV-01 has docked with the Lunar Station and this marks the official end of Mission #1.

Current Plans are to spend the next 3 months at the Lunar Station bringing up the cargo for our next mission to Saturn's moon Titan. The mission will start with a 100 day transit directly from Lunar orbit with a slingshot around the Earth. The assembly crew will be given a 150 day window to bring the Titan Station up to initial occupancy capability, and then a 100 day transit back to the Lunar...
HUMONGOUS IMS shipbuilder
Views 4480 Comments 2 Dantassii is offline

All times are GMT. The time now is 06:03 AM.

Quick Links Need Help?


About Us | Rules & Guidelines | TOS Policy | Privacy Policy

Orbiter-Forum is hosted at Orbithangar.com
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2019, vBulletin Solutions Inc.
Copyright 2007 - 2017, Orbiter-Forum.com. All rights reserved.