Orbiter-Forum  

Go Back   Orbiter-Forum > Blogs
Register Blogs Orbinauts List Social Groups FAQ Projects Mark Forums Read

Notices

Old

T+ 380 Days Engineering Log

Posted 02-22-2016 at 11:25 PM by Dantassii
Tags sstv

Phasing burns began today and will continue until we make our lunar insertion burn in 2 weeks time. We are cycling through our collection of EHEs using a different set each burn. After 1 day of burns we have had no issues with any of the EHEs.

These phasing burns are a practice of sorts for the burns that will be made by SSTV-02 when it arrives at Pluto after a 100 day transit from LEO and when it arrives back to the Earth-Moon system again after a 100 day transit from Pluto. The...
HUMONGOUS IMS shipbuilder
Views 1373 Comments 0 Dantassii is offline
Old

T+ 375 Days Engineering Log

Posted 02-18-2016 at 12:17 AM by Dantassii
Tags sstv

MCC #9 was performed with no flags.

Due to our high approach speed to the Earth-Moon system, we will begin 12 days of phasing burns to slow our closest approach speed down while maintaining our correct trajectory to arrive at the Lunar Station in 20 days. Phasing burns are usually 5-10 minutes in duration at 1-1.5 g's followed by an hour or 2 of calculations before the next burn is performed. As the burn calculations are very straight forward, we will continue our existing duty cycles...
HUMONGOUS IMS shipbuilder
Views 2555 Comments 2 Dantassii is offline
Old

The Voyages of USS Bellerophon

Posted 02-17-2016 at 08:50 PM by Trekkie

"This Story is Completely Fictional and does not follow the Main Star Trek Story"

At the Utopia Planitia Fleet Yards Captain Jordy and his crew were ready to go to the newest ship in the Starfleet: The USS Bellerophon (Intrepid Class Starship)



Captain Jordy Talks to his First Officer Brock

Jordy: "Brock is everything ready for our first mission?"

Brock: "Yes...
Trekkie's Avatar
Starfleet Captain
Views 1147 Comments 0 Trekkie is offline
Old

MER-C - MSA's first interplanetary mission

Posted 01-29-2016 at 07:10 AM by IronRain

Less then 48 hours left on the countdown clock for MER-C, MSA's first interplanetary's mission. The rover will be send on a journey to the red planet to study one of the future landing sites for human missions. The landing site is known as the D. Weijers crater.

(Everything in red is not related to the article and is just some personal information I would like to give).

The mission
The rover is a twin of the original MER-A and MER-B rover. This was decided to...
IronRain's Avatar
Orbinaut
Posted in MSA updates
Views 3364 Comments 4 IronRain is offline
Old

T+ 352 Engineering Log

Posted 01-25-2016 at 10:49 AM by Dantassii
Tags sstv

MCC #8 was performed 2 days ago. Several component racks came loose in one of the Hydroponics Modules which caused some damage during the burn. No hull punctures were discovered, but the damaged module had to be taken offline for 2 days while repairs were performed. Module is now back up and working although a significant amount of our repair supplies were consumed.

As the SSTV series of vehicles are designed to be self sufficient on consumables, there is not a lot of excess consumable...
HUMONGOUS IMS shipbuilder
Views 838 Comments 0 Dantassii is offline

All times are GMT. The time now is 03:55 PM.

Quick Links Need Help?


About Us | Rules & Guidelines | TOS Policy | Privacy Policy

Orbiter-Forum is hosted at Orbithangar.com
Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright 2007 - 2012, Orbiter-Forum.com. All rights reserved.