Orbiter-Forum  

Go Back   Orbiter-Forum > Blogs
Register Blogs Orbinauts List Social Groups FAQ Projects Mark Forums Read

Old

ISA Server relocation

Posted 02-04-2011 at 09:46 AM by garyw
Updated 02-05-2011 at 02:37 AM by garyw

ISA now has a home on a new server (isa.gdwnet.com) and is back up and running. There are still some graphics tweaks to bring acorss but all the data is available again.
garyw's Avatar
O-F Administrator
Posted in Uncategorized
Views 2666 Comments 0 garyw is offline
Old

GASS, Mission 1-5

Posted 02-03-2011 at 07:42 PM by Grover
Updated 02-03-2011 at 07:50 PM by Grover (Fixing Scenario)

Well, the time has come to launch the first parts! after some preparations and research, i have found my construction methods, as described in my mission plan

[Mission 1- Tug launch] ---==--- a Tranzit tug, will be launched using the Energia and a DM2 tug, placing the Tranzit in a 400Km orbit, with plane close to the moon (RInc < 0.5*), it will then serve as the reference point for all other launches (Tug's designation is "z GASS"

[Mission 2- Hab1 mission]...
Attached Files
File Type: scn GASS.scn (14.8 KB, 4 views)
Grover's Avatar
Saturn V Misfire
Views 3481 Comments 5 Grover is offline
Old

HASA update - Chapman launched

Posted 02-02-2011 at 10:07 AM by IronRain
Updated 02-02-2011 at 10:10 AM by IronRain

Chapman launched
HASA made its firsts steps outside the Earth-moon system with the launch of Chapman. The launch went very smooth and the probe placed in orbit a couple of minutes later. The TMI (Trans Martian Injection) went not so smooth. When the engine fired to place the probe on a path to Mars, it fired for a couple of seconds and then shutdown again. After a short evaluation, ground controllers were able to determine what the failure caused and how to solve it. After a couple of minutes,...
IronRain's Avatar
Orbinaut
Posted in HASA - updates
Views 2131 Comments 2 IronRain is offline
Old

MTS Shuttle System

Posted 02-01-2011 at 12:48 AM by Loru (Loru's Developement Projects)
Updated 02-01-2011 at 01:35 AM by Loru
Tags mts, vertigo

Jarvis SC Developement Division

MTS Shuttle System

Purpose: Reusable craft to carry up to 4 men & 5000kg cargo up to GEO for about 2 week operation time.

System elements:

Vertigo Shuttle - Spaceplane with 4 x 6 m payload bay and APAS system under the nosecone.
MTS Launch System - LOX/Kerosene core stage + Solid Rocket Boosters. designed to carry shuttle...
Loru's Avatar
Moderator
Views 7665 Comments 9 Loru is offline
Old

GASS- early stages

Posted 01-31-2011 at 08:19 PM by Grover
Updated 02-03-2011 at 06:53 PM by Grover

Welcome, to the Grover-Ascension Space Station, the combined efforts of Altea Aerospace, Ascension International and the Grover corporation!

This is going to be my first personal orbiter project, the complete construction of an orbital space station, using the XR5 and Space station building blocks.

I will be launching from Wideawake, placing the station into orbit with a plane close to that of the Moon, with an orbital altitude of approximately 400Km

This will...
Grover's Avatar
Saturn V Misfire
Posted in Uncategorized
Views 4165 Comments 7 Grover is offline

All times are GMT. The time now is 10:13 AM.

Quick Links Need Help?


About Us | Rules & Guidelines | TOS Policy | Privacy Policy

Orbiter-Forum is hosted at Orbithangar.com
Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright 2007 - 2012, Orbiter-Forum.com. All rights reserved.