Orbiter-Forum  

Go Back   Orbiter-Forum > Blogs > Dantassii
Register Blogs Orbinauts List Social Groups FAQ Projects Mark Forums Read

Rate this Entry

T+ 352 Engineering Log

Posted 01-25-2016 at 10:49 AM by Dantassii
Tags sstv

MCC #8 was performed 2 days ago. Several component racks came loose in one of the Hydroponics Modules which caused some damage during the burn. No hull punctures were discovered, but the damaged module had to be taken offline for 2 days while repairs were performed. Module is now back up and working although a significant amount of our repair supplies were consumed.

As the SSTV series of vehicles are designed to be self sufficient on consumables, there is not a lot of excess consumable storage on board, However, even if we had been unable to repair the damaged Hydroponics Module, the remaining modules and our storage would have given us enough food to complete the mission. As it is, we had the materials and the time to perform the repair, so it was done.

All boards are green at this time. Next mission event, MCC #9 in 23 days.

The remaining milestones for this mission:
  • T+375 Days MCC #9
  • T+380 Days Begin Earth-Moon system phasing burns
  • T+392 Days Closest approach to Earth, Earth-Moon system capture burn
  • T+394 Days Initial Lunar orbit insertion burn
  • T+395 Days Arrival at Lunar Station and end of SSTV-01 Mission #2
Dantassii
HUMONGOUS IMS shipbuilder
« Prev     Main     Next »
Total Comments 0

Comments

 

All times are GMT. The time now is 06:47 AM.

Quick Links Need Help?


About Us | Rules & Guidelines | TOS Policy | Privacy Policy

Orbiter-Forum is hosted at Orbithangar.com
Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright 2007 - 2012, Orbiter-Forum.com. All rights reserved.