Orbiter-Forum  

Go Back   Orbiter-Forum > Blogs
Register Blogs Orbinauts List Social Groups FAQ Projects Mark Forums Read

MY ORBITER EXPERIENCE
Old

STS-29 with Truss S2

Posted 05-15-2009 at 10:26 AM by Matte (Per Aspera ad Astra)

<<STS-29 , 26 November 2010 , 06:03:56 UT>>
Shuttle Atlantis lifted off tonight for rescheduled STS-29 mission to bring S2 extra truss to Celestia Space Station.
The 7 crew members will perform a 14 days long-duration mission to interpose the new truss between the S1 and S3 trusses, to allow future installation of an extra heat radiator.



<<STS-29...
Matte's Avatar
Orbinaut
Posted in Uncategorized
Views 3926 Comments 0 Matte is offline
Old

Extra STS mission scheduled

Posted 05-01-2009 at 10:32 AM by Matte (Per Aspera ad Astra)

Space Agency has approved 2 extra STS mission, STS-29 and 30, that will precede STS-28.

Due to the excess of heating produced by the station, extra radiators are needed, but the space actually available on the trusses is not enough.
So the 2 shuttles will deliver to CSS 2 new trusses that will be interposed between the existent 2 and the P3/4 and S3/4 segments.

The 2 long duration missions will be very challenging: in fact it will be needed to remove and temporarly...
Matte's Avatar
Orbinaut
Views 3269 Comments 0 Matte is offline
Old
Rating: 5 votes, 5.00 average.

CTV-01 test vehicle

Posted 04-10-2009 at 10:55 AM by Matte (Per Aspera ad Astra)
Updated 04-17-2009 at 01:56 PM by Matte

<<CTV-01 , 01 November 2010>>
LIFTOFF.

The first vehicle of the CTV serie blasted off aboard an Ariane 5 from Kourou this morning (local time).

CTV-01 is unmanned.
It is the 1st of 2 unmanned flight that will test deeply all the systems.

Mission duration is 2 days, and will end with reentry and recovery of the capsule.

CTV-03 will carry 4 astronauts in orbit.
Manned science flights will be CTV-03, 04 and 05, and will end...
Matte's Avatar
Orbinaut
Views 6156 Comments 0 Matte is offline
Old

STS-27 with S5 and MPLM-2

Posted 04-09-2009 at 10:54 AM by Matte (Per Aspera ad Astra)
Updated 04-20-2009 at 10:41 PM by Matte

<<STS-27 , 25 October 2010 , 10:25:00 UT>>
Space Shuttle discovery lifted off on mission STS-27 to deliver starboard adapter S5 that will allow attachment of the final array set in early 2011, and MPLM-2 that will substitute MPLM-1 as a storage module with a capability of fuel storage of 1000 kg, 600 kg more than the previous one.

4 EVAs are scheduled:
-EVA1: attachment of the S5 segment to S4.
-EVA2: temporary docking of MPLM-2 to the port side of Multi-docking...
Matte's Avatar
Orbinaut
Views 4494 Comments 0 Matte is offline
Old

PROGRESS-06

Posted 04-06-2009 at 12:16 PM by Matte (Per Aspera ad Astra)
Updated 05-23-2009 at 12:07 PM by Matte

<<Progress-06 , 15 September 2010 , 21:46:28 UT>>
Progress-06 lifted off from Baikonur Cosmodrome this evening for the 6th resupply mission to CSS.
It will deliver supplies in preparation for arrival of Discovery's STS-27 mission in late October, and fuel for CSS and for the upcoming MPLM Raffaello's reserve tanks.

<<Progress-06 , 17 September 2010 , 06:08:50 UT>>
Progress-06 is safely docked to Zvezda aft hatch.
In the next few months...
Matte's Avatar
Orbinaut
Views 2817 Comments 0 Matte is offline

All times are GMT. The time now is 02:12 AM.

Quick Links Need Help?


About Us | Rules & Guidelines | TOS Policy | Privacy Policy

Orbiter-Forum is hosted at Orbithangar.com
Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright 2007 - 2012, Orbiter-Forum.com. All rights reserved.